Bangladesh Boduakali 1320MW Coal-fired Power Plant Project
1320 MW
Installed Capacity / Project Scale
Project Overview
Huanghua Group supplied power-distribution equipment for the Boduakali coal-fired power plant project. The package was coordinated around high-load auxiliary systems, continuous service, project drawings and the installation sequence.

Planning a power distribution project?
Share your voltage level, capacity, application and delivery requirements with our international project team.
Contact Us 





















